The Building
A large former office building in Crawley, originally planned for conversion to 35 residential units across two phases — 24 units under Class MA in Phase 1 and 11 units in Phase 2. The project also included full planning for subdividing the ground floor commercial space into smaller units.
The Challenge
Phase 1 was already in construction when it was discovered that a pre-commencement condition had not been discharged — rendering the permitted development consent invalid. Full planning had to be sought to regularise the works, resulting in one unit being lost and Phase 1 reducing to 23 units. The original drawings had been produced by hand by an architect who had since retired, with no digital files left to work from.
The Solution
PWA was brought in to redraw the entire Phase 1 scheme from scratch in digital format — accurate, scalable drawings that could be updated as the project evolved. The full planning application was managed through a separate planning consultancy. PWA handled the subsequent discharge of planning conditions, co-ordinated the required reports, and managed the council contribution process. Phase 2 was then progressed under Class MA with PWA producing the drawings and managing the prior approval application.
The Result
34 units delivered across both phases. The full planning route for Phase 1 required additional 2-bed units to satisfy planning policy, reducing the total by one from the original 35. All conditions discharged; Phase 2 approved under permitted development within 56 days.